The all-in-one food waste machine has changed the past Food waste treatment Improper resource waste and serious environmental pollution. The technology uses high-temperature aerobic process to recover food waste. The food waste transported shall be sorted first. After sorting, the biochemical solid waste can enter the pulverizer, and the preliminary crushing process is uniform crushing. The organic solid waste with a moisture content of 70% is squeezed and dehydrated into the biochemical cabin, and the 24-hour high-temperature biochemical treatment is started. The oil and water after extrusion deoiling and dehydration respectively enter the oil-water separator and Sewage treatment equipment Perform multiple processing. Finally, the waste oil is supplied by the raw materials of biodiesel extracted from regular refineries, and the wastewater can reach the standard discharge after being treated and purified by the sewage treatment equipment using biological liquid medicine for many times. After 24 hours, the solid waste will be transformed into high protein nutrient base fertilizer. The odor of the biochemical cabin is regularly discharged from the ventilator to the first process carbon box for adsorption, and then enters the tail spray tower for secondary treatment, and then reaches the standard emission.

Food waste can be automatically weighed, automatically broken, automatically deoiled and dehydrated, automatically fermented, and automatically deodorized through the food waste integrated machine. Oil circulation temperature controller or hot air circulation automatic control can accurately control the temperature of food waste in the box, the addition and turnover frequency of bacterial materials. Food waste can naturally mature into ecological fertilizer within 24 hours.
Precautions for the first use of the food waste all-in-one machine:
1. Please read all instructions carefully before using the machine for the first time.
2. Users are not allowed to install, maintain or move the machine by non designated personnel. Otherwise, unexpected accidents may occur. If users need the above services, please contact the company.
3. The processor must be installed by the unit and personnel approved by the company, and users are not allowed to install, maintain or move the processor.
4. Set the specific daily processing capacity of the processor under the guidance of the professional personnel of the fungus material supplier.
5. The user shall not damage the power cord during use. If a separate connection is required during use, please contact a professional. It is strictly prohibited to stack heavy objects on the power line, and it is strictly prohibited to place the power line near the high temperature heat source, otherwise short circuit, fire or electric shock accidents may be caused.
6. Do not cut off the power supply (such as turning off the power switch) during operation. If the power supply needs to be cut off in an emergency, the machine must be restarted after the power is restored.
7. When we first use this machine, we need to activate bacteria. This process is a relatively professional process, which is completed by technicians designated by our company. When the activation process is not completed, do not decompose the garbage. Therefore, the time and quantity of the first waste input should be under the guidance of our technical personnel.
8. After each operation, the cover of the operation box must be locked and the key kept by a specially assigned person.